  These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. The main difference between panel method and the method discussed in the last paragraph is_______.

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  22. Which of these statements is TRUE of system building?

  A. It employs more men. B. It is difficult and dangerous.

  C. It can save both time and money. D. It means less mechanization.

  23. According to the passage, the principle of system building is that_______.

  A. construction methods are safer

  B. buildings are made from a set of standardized units

  C. similar buildings can be produced

  D. all units are produced on the site

  24. The usual fixed length in the modular system is_______.

  A. twenty centimeters B. ten millimeters

  C. fifty centimeters D. ten centimeters

  25. What lifts the concrete panels onto the building?

  B. Man-power.

  C. Pulleys. D. Hydraulic jacks.

  21. A 22. C 23. B 24. D 25. A

  

  These are either made at the building-site or at a factory. Some designers, in fact, are standardizing the dimensions of rooms. They are made in multiples of a single fixed length, usually ten centimeters. This is called a modular system, and it means that manufactures can produce standardized fittings at a lower cost. The most important fact about system building is its speed. A ten-storey flat, for example, can be completed in four months.

  There are several new methods of system building. One is the panel method. In this case, the construction company sometimes erects a factory on the site. The walls and floors of the building, called panels, are cast in a horizontal or vertical position. Conduits for electrical wires and sleeves for pipes are cast in the panels when they are being made. The moulds for making these castings are situated all around the building.

  After the concrete panels are cast, they are allowed to set and harden for a week. Next they are lifted by a tower crane on to any section of the building. There the panels are cemented together at their joints and the floor covering is laid.

  After the panels have been cemented together, the crane lifts a case into the area. It contains all the fittings to be installed, such as wash-basins, radiators and pipes. Finishing tradesmen, such as plumbers, plasterers, painters and electricians, follow behind to complete the work.

  In some building developments, in some countries, whole flats with internal features like their bathrooms, bedrooms and connecting stairs, and weighing as much as twenty tons, are carried to the building-site ready-made. A giant overhead crane is used to lift them into position. In the future, this method may become more widespread.

  1. The main difference between panel method and the method discussed in the last paragraph is_______.

  A. the latter uses ready-made internal features

  B. panels are cast in a level position

  C. the former is used to build walls and floors while the latter to construct bathrooms or bedrooms

  D. the former is more expensive than the latter

  22. Which of these statements is TRUE of system building?

  A. It employs more men. B. It is difficult and dangerous.

  C. It can save both time and money. D. It means less mechanization.

  23. According to the passage, the principle of system building is that_______.

  A. construction methods are safer

  B. buildings are made from a set of standardized units

  C. similar buildings can be produced

  D. all units are produced on the site

  24. The usual fixed length in the modular system is_______.

  A. twenty centimeters B. ten millimeters

  C. fifty centimeters D. ten centimeters

  25. What lifts the concrete panels onto the building?

  B. Man-power.

  C. Pulleys. D. Hydraulic jacks.

  21. A 22. C 23. B 24. D 25. A

  

主站蜘蛛池模板: 欧美成人全部免费观看1314色| 中国特黄一级片| www.爱爱视频| 欧美性猛交xxxx乱大交丰满| 在线看成品视频入口免| 国产一区二区在线观看视频| 久久精品无码一区二区日韩av| 日本免费a视频| 最近中文字幕2018中文字幕6| 国产福利在线小视频| 亚洲av永久无码精品秋霞电影影院| 两个人看的视频www在线高清| 欧美国产日韩在线| 国产爽的冒白浆的视频高清| 亚洲av无码电影网| 黑人巨大两根69gv| 日韩网新片免费| 国产免费福利片| 久久久久久AV无码免费网站 | 成人午夜18免费看| 又粗又硬又爽的三级视频 | 免费看少妇作爱视频| h片在线播放免费高清| 波多野结衣一区二区免费视频| 国语精品高清在线观看| 亚洲国产精品无码久久一线| 日本理论片www视频| 日本电影100禁| 又粗又长又硬太爽了视频快来| h片在线播放免费高清| 熟妇人妻一区二区三区四区 | 一二三四社区在线高清观看在线| 看黄色免费网站| 国内久久精品视频| 亚洲乱码卡一卡二卡三| 香蕉久久ac一区二区三区| 日本一二线不卡在线观看 | 久久精品*5在热| 美女把屁屁扒开让男人玩| 好男人好影视在线播放| 亚洲欧美日韩久久精品第一区|